Software Development:


In the V model development process based on the establishment of the underlying, application layer development tool chain, to ensure that the R & D process to be specific implementation. In the test phase, the model is tested by multiple tests to ensure the correctness of the model: first, the MIL (model in the ring), the model is in the process of the demand, Test) to model the functional verification, to achieve 100% coverage requirements, and then SIL (software in the ring test) to verify the code and the model output is the same, to determine the correct code generated automatically. And the above tests are simulation test can be found earlier on the design loopholes, greatly improving the quality of research and development.

Hardware Development Department:

Responsible for battery management system hardware architecture design, schematic design, hardware unit testing and reliability testing, EMC design and rectification; hardware DFMEA, WCA, FTA analysis and calculation, tracking automotive electronics safety regulations, familiar with ISO26262 functional safety standards with hardware circuit Simulation capacity; responsible for the battery management system machine, the module test outline preparation, according to customer technical requirements to compile all the relevant hardware and standardized testing and standard file records to ensure that the product design output quality; responsible for the battery system test bench design Work to assist in the PACK design performance evaluation and safety test evaluation; support and solve the system development, production process related issues to solve the customer vehicle development process problems encountered;

Test Verification Department:


Integrated Management Department:

It is responsible for summarizing and analyzing the competitive products, putting forward the specific needs of the BMS platform, formulating the BMS system framework and control strategy, and using the modeling software to describe the strategy; docking the customer project, decomposing the customer's demand, proposing the customer's differentiated demand and coordinating the relevant R & D personnel to achieve; management BMS platform project, the platform project related issues in the follow-up, feedback, coordination of relevant resources to solve; participate in 26262 standard system integration function.

Cell Application:

Based on the essential properties of the battery as the base point to meet the performance of the system as the goal, responsible for the project of the core selection, with the group and its incoming standard development, while the use of battery curve fitting for sorting technology research; Batteries, materials, structures and other basic design information to establish the thermal model of the batteries for the module, PACK thermal simulation and thermal management system to provide data support; based on the battery routine testing and various conditions test, found the internal law, The battery management system's SOX algorithm provides data support. Responsible for lithium-ion battery, the next generation of advanced battery information collection and manufacturers of technical exchanges to ensure that the Wanda Wanda electric car batteries keep up with the forefront of domestic and foreign companies to maintain the advanced nature of technology



Follow us

scan it
Stay tuned for the latest news
蚌埠大学城300一晚,蚌埠大学城怎么找学生,蚌埠友谊路女价格多少_有惊喜